Glow Phase 2

By utilizing ultra-compact, modular, and standardized coolers that can be efficiently transported via sea-freight in standard containers, organizations can achieve significant savings of 20-30% on their Total Acquisition Cost.

Client: Jurong Engineering Limited
Location: Map Ta Phut, Tayong, Thailand
Capacity: -
Plant: 2x Gas Turbine (SGT-800)
Order: 2021/Q1
Hardware: Coolers, Piping, Pump Skid, Expansion Tank, Peak Cooling System
Services: Engineering, Testing, Quality Assurance
Previous
Previous

Tamazunchale

Next
Next

Grain Grid Stabilizer